1.CHECK FIELD: We analyzed the resistance, the peculiarities of the terrain and depth.
2. EARTHWORKS AND TRENCHING: It paves the way correcting unevenness and emptying spaces in areas which are to stand the ground.
3. FOUNDATIONS: The blocks (concrete cubes that are placed on the pillars) are built. When land is not very resistant, reinforced concrete slabs are constructed. If the firm is very deep, the piles (concrete columns high) are used. The water-drainage chests are also built.
4. CONSTRUCTION OF THE STRUCTURE: Depending on the type of building, the structure rests on pillars (iron or concrete drive) or on walls.Above the pillars and walls, beams and slabs are placed.When we build the floors must take into account the elevators, stairwells …
5. RISING OF THE CLOSING: The closings are the partitions that cover the exterior of the building and separate the interior spaces. When we build, we must consider the gaps of doors, windows and small courtyard, where they are located the pipes, the cables...
6. PLACEMENT FACILITIES: The hot water pipes and cold, gas, heating, electricity, TV... are laid and attached.
7. FINISH: The floors, plaster, paints, varnishes, the cerrejería, the paneling, the doors ... are placed.
2. EARTHWORKS AND TRENCHING: It paves the way correcting unevenness and emptying spaces in areas which are to stand the ground.
3. FOUNDATIONS: The blocks (concrete cubes that are placed on the pillars) are built. When land is not very resistant, reinforced concrete slabs are constructed. If the firm is very deep, the piles (concrete columns high) are used. The water-drainage chests are also built.
4. CONSTRUCTION OF THE STRUCTURE: Depending on the type of building, the structure rests on pillars (iron or concrete drive) or on walls.Above the pillars and walls, beams and slabs are placed.When we build the floors must take into account the elevators, stairwells …
5. RISING OF THE CLOSING: The closings are the partitions that cover the exterior of the building and separate the interior spaces. When we build, we must consider the gaps of doors, windows and small courtyard, where they are located the pipes, the cables...
6. PLACEMENT FACILITIES: The hot water pipes and cold, gas, heating, electricity, TV... are laid and attached.
7. FINISH: The floors, plaster, paints, varnishes, the cerrejería, the paneling, the doors ... are placed.